Using knowledge gained during 14 months of pilot plant operation Integro has developed a Single Line Production facility in Greenville, South Carolina.

  • The facility will produce approximately 11,000 metric tons per year in continuous flow.

 

The vertical multiple tray design will validate Integro’s technology approach.

  • It is designed to run 24 hours a day, 7 days a week.

 

The reactor design is flexible to allow for a variety of feedstocks as raw material.

  • Southern Yellow Pine waste is the primary feedstock at our Greenville plant, but our system is designed to handle a wide range of feedstocks, making it adaptable to any situation.

 

Integro’s proprietary densification system will be incorporated in the final steps of the production process.

  • NuCoal™ is durable and water resistant as a result of the technology approach used during production.

 

The facility will produced large scale samples for test burns with potential customers using a single production line of our commercial technology.

  • The Greenville NuCoal™ Facility and its site has the necessary elements in place for rapid expansion.

 

The plant will enable interested parties to view a working torrefaction system in operation.

  • Those interested in construction of a torrefaction facility are welcome to visit and observe the Integro NuCoal™ system at work. Just Contact Us.